CAD/BIM Coordination

At CMRichey, we understand that successful project delivery begins long before the first wire is pulled. Our in-house CAD and BIM capabilities play a vital role in driving project efficiency, minimizing conflicts, and improving installation accuracy from start to finish. We treat coordination not as a box to check, but as a strategic asset that contributes directly to field productivity and schedule certainty.

Proactive Planning & Collaboration

Our dedicated Project Engineer actively engages in the preconstruction and coordination process—collaborating with general contractors, design teams, and other trades to ensure all systems are properly aligned. By participating early in layout planning and clash detection meetings, we help reduce the risk of field conflicts and change orders, paving the way for smoother installations.

Conflict Resolution & Installation Sequencing

By leveraging 3D coordination models, our team can identify spatial conflicts and routing issues well before field installation begins. This allows us to adjust designs, reroute pathways, and stage installations more effectively—saving time and labor while preserving quality.

The Value of CAD/BIM Coordination

Clash Detection

Identifies design conflicts early, preventing costly rework during construction.

Improved Accuracy

Detailed 3D models ensure precise layouts and minimize installation errors.

Faster Project Delivery

Coordinated planning streamlines workflows and reduces delays.

Cost Efficiency

Early issue resolution and accurate planning lower material waste and expenses.

Enhanced Collaboration

All trades work from a unified model, improving communication and efficiency.

Lifecycle Value

Digital models provide long-term support for maintenance and future upgrades.

Field-Ready Drawings & Layouts

We produce highly detailed shop drawings, layout files, and installation plans that are field-tested and construction-ready. These documents help ensure consistency across crews and phases while aligning with actual field conditions and project phasing.

Improved Efficiency & Fewer Delays

With strong coordination practices, our team helps reduce rework, streamline material handling, and improve overall jobsite sequencing. The result is a more efficient project lifecycle, better resource planning, and fewer surprises during installation.